Port: Installing sheer clamp. Starboard: Cleaning up excess epoxy from new sheer clamp.
Cutting notches for deck beams; dry-fit mast bulk head and deck beams.
Dry-fit forward deck beams; installing floors; starting to fit aft deck beams.
Forward deck beams and breasthook dry-fitted, ready for next year's class.
Coating inside forward tank with epoxy, getting ready to glue in bulkhead and deck beams. Installing side deck spacer.
Gluing in deck beams and deck stringer.
Making sure that the mast deck beam and bulkhead are straight. (Note straightedge.)
Coaming knees installed; trimming to camber pattern.
Installing quarter knees and aft deck beams.
Fastening laminated floors.
Preparing to install the floor filler blocks.
Installing the trunk log cleat.
Sole beams installed.
Pattern-routing the centerboard.
Final shaping; lead insert complete