Final trimming of scarf joint.
Gluing up the scarf joint.
Clamping the scarf joint.
Spiling the garboard.
Marking out plank shape on planking stock.
Fairing the batten.
Rough sawing the plank pair.
Final trimming of plank pair.
Dry fitting the garboards.
Final attachment of garboard, with epoxy putty.
Gluing up laminated floors and sheer clamps. (Then removed for later installation.)
Attaching plank #3.
Plank #3.
Clamping plank with temporary batten and screws into webframes.
Cleaning up epoxy squeeze-out inside the hull.
Wetting out lap joint with clear epoxy.
Applying to epoxy putty to wetted-out lap; trimming garboard for keel.
Installing the second sheer plank; cleaning up epoxy along batten and under the hull.
Attaching the final temporary batten.
Beers are in the fridge.