Building, part two
scarfing

Final trimming of scarf joint.

scarfing

Gluing up the scarf joint.

scarfing

Clamping the scarf joint.

planking

Spiling the garboard.

Planking

Marking out plank shape on planking stock.

planking

Fairing the batten.

planking

Rough sawing the plank pair.

planking

Final trimming of plank pair.

planking

Dry fitting the garboards.

planking

Final attachment of garboard, with epoxy putty.

laminating

Gluing up laminated floors and sheer clamps. (Then removed for later installation.)

planking

Attaching plank #3.

planking

Plank #3.

planking

Clamping plank with temporary batten and screws into webframes.

planking

Cleaning up epoxy squeeze-out inside the hull.

planking

Wetting out lap joint with clear epoxy.

planking

Applying to epoxy putty to wetted-out lap; trimming garboard for keel.

planking

Installing the second sheer plank; cleaning up epoxy along batten and under the hull.

planking

Attaching the final temporary batten.

planking

Beers are in the fridge.